Machinery Directive 2006/42/EC:
• Safety of any powered equipment with moving parts
• Power can be electrical, pneumatic, hydraulic or other;
• Requirements for guarding, safety factors for loading, reliability of safety systems, marking and instructions;
• Extensive requirements for marking and instructions
Definition of Machinery:
• An assembly of linked parts or components at least one of which moves, with appropriate actuator, control and power circuits etc., joined together for a specific application, in particular for the processing, treatment, moving or packaging of a material.
• Interchangeable equipment modifying the function of a machine, which is placed on the market for the purpose of being assembled with a machine or series of machines, or with a tractor by the operator himself in so far as this equipment is not a spare part or tool.
There are some exclusions listed in the Directive:
• Medical machines in contact with patients
• Passenger lifts and mine winders
• Boilers and pressure vessels
• Means of transport
• Military equipment
Please refer to the machinery directive for detailed requirements
Services that we offer as a notified body
CTI-CEM can offer various services including type examination to all products within our accredited scope. These services include:
Type Examination:
CTI-CEM can provide full EC Type Examination of machinery and issue a certificate confirming that it meets the requirements of the Machinery Directive. This is a requirement if a machine is listed in Annex IV and is not manufactured in accordance with relevant harmonised standards. It is also available for other machinery where third party certification is desired. A "machine" may also be an assembly of machines which , in order to achieve the same end, are arranged and controlled so that they function as integral whole.
Technical File Lodging:
For any CE marked products under the Machinery Directive, you may lodge the technical files of your product(s) with us. CTI-CEM will acknowledge receipt and provide secure storage for 10 years after the date of last manufacture.
The technical file should comprise:• a detailed documentation on the construction of the machinery including drawings of the machinery and its parts,
• test results,
• description of protective measures
• other elements as described in Annex VII, A(a).
Also, the file must contain a copy of the EC declaration of conformity.
The manufacturer must also provide documents for series production and internal measures that will be implemented to ensure that the machinery remains in conformity with the provisions of this Directive (Annex VII, A (b)).
The manufacturer must carry out the necessary tests on components, fittings or the completed machinery to determine whether it can be assembled and put into service safely. The relevant reports and results shall be included in the technical file.
The manufacturer or his authorised representative is requested to keep copies of the technical documentation for a period of 10 years after the last product was placed into the market.
Contact
CTI-CEM International Ltd.
Unit 200 Greenogue Business Park,
Grants Lane,
Rathcoole,
Co. Dublin
Telephone: +353 1440-2567
Email: info@cti-cem.com